Cook Road Bridge No. C35-0.91 Replacement – MI-15-18

CONTACT:

Doug Royer, Deputy Engineer

513-732-8885

HISTORY OF PROJECT:

The existing bridge is 21-foot span bridge with a rating appraisal of 4.  The proposed bridge will be a cast in place 4-sided concrete box.  OPWC funding was secured for this bridge in July 2021 and the project is now ready to proceed to public bidding.

COSTS:

The estimated construction cost is $477,300.00.  This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds.

TIME PERIOD:

The completion date for this project is set at November 1, 2024

PROJECT DOCUMENTS:

Legal Notice – PDF

Bid Results – PDF

PROJECT STATUS:

Under Construction

C35-091_Cook-Rd