CONTACT:
Doug Royer, Deputy Engineer
513-732-8885
|
HISTORY OF PROJECT:
The existing bridge is 21-foot span bridge with a rating appraisal of 4. The proposed bridge will be a cast in place 4-sided concrete box. OPWC funding was secured for this bridge in July 2021 and the project is now ready to proceed to public bidding.
|
COSTS:
The estimated construction cost is $477,300.00. This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds.
|
TIME PERIOD:
The completion date for this project is set at November 1, 2024
|
PROJECT DOCUMENTS:
Legal Notice – PDF Bid Results – PDF
|
|
PROJECT STATUS:
Under Construction
|
|

|
|