CONTACT:
Doug Royer, Deputy Engineer
513-732-8885
|
HISTORY OF PROJECT:
The existing bridge is a 51-foot span bridge load rated at 12 tons and bridge appraisal of 4. The proposed bridge will be a prestressed beam on capped pile abutments. OPWC funding was secured for this bridge in July 2022 and the project is now ready to proceed to public bidding.
|
COSTS:
The estimated construction cost is $750,000.00. This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds. (The Construction Contract was Awarded for $737,512.41)
|
TIME PERIOD:
The completion date for this project is planned for December 2023
|
PROJECT DOCUMENTS:
Legal Notice – PDF Bid Results – PDF
|
|
PROJECT STATUS:
Completed
|
|

|
|