Shayler Road Bridge No. C107-1.98 Replacement – UN-28-20

CONTACT:

Doug Royer, Deputy Engineer

513-732-8885

HISTORY OF PROJECT:

The existing bridge is a 30-foot span bridge load rated at 28 tons and bridge appraisal of 4.  The proposed bridge will be a prestressed beam on capped pile abutments.  OPWC funding was secured for this bridge in July 2021 and the project is now ready to proceed to public bidding.

COSTS:

The estimated construction cost is $580,697.00.  This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds.

TIME PERIOD:

The completion date for this project is planned for Fall of 2024.

PROJECT DOCUMENTS:

Legal Notice – PDF

Bid Results – PDF

PROJECT STATUS:

Completed

C107-198-Shayler-Rd