CONTACT:
Doug Royer, Deputy Engineer
513-732-8885
|
HISTORY OF PROJECT:
The existing bridge is a 30-foot span bridge load rated at 28 tons and bridge appraisal of 4. The proposed bridge will be a prestressed beam on capped pile abutments. OPWC funding was secured for this bridge in July 2021 and the project is now ready to proceed to public bidding.
|
COSTS:
The estimated construction cost is $580,697.00. This project will be funded 79% from OPWC funds and the remaining 21% from local MVG funds.
|
TIME PERIOD:
The completion date for this project is planned for Fall of 2024.
|
PROJECT DOCUMENTS:
Legal Notice – PDF Bid Results – PDF
|
|
PROJECT STATUS:
Completed
|
|

|
|