2024 Landslide Project, LS-17-25

2024 Landslides Project # LS-17-25

Contact: Fredrick Sturgis, Staff Engineer (513) 314-3431

Purpose/Need: This project will repair landslides on Hopper Hill Road (C-61), Baldwin Road (T-210), Coombs Road (T-414), and Moscow Cemetery Road (T-3096), located in Various Townships.

Action Necessary: Advertisement of Legal notice to obtain bids for this landslide repair project. The legal notice advertised in Clermont Sun on December 18, 2025, and also placed on the County website. Bid opening to be on January 15, 2026.

History of Project: All 4 landslides are similar with the following description: The landslide currently has an embankment failure causing a width restriction for the traveling public.  An application was filed with OPWC in September of 2023.  The OPWC application and agreement authorization was approved by Board on 9/13/2024 and the County Engineer executed the Grant Agreement on July 1, 2024.

Costs: The construction cost is estimated as follows:

 

Project

 

Road/Township

 

Total Project Amount

2024 Landslides

 

Hopper Hill Road (C-61)/Pierce Township

Baldwin Road (T-210) /Union Township

Coombs Road (T-414) /Washington Township

Moscow Cemetery Road (T-3096) /Washington Township

Project Cost                      $ 1,207,210.05

 

 

Expected Outcomes: Stabilize the existing landslides and repair the roadways on Hopper Hill Road (C-61), Baldwin Road (T-210), Coombs Road (T-414), and Moscow Cemetery Road (T-3096).

Time Period: Project is to be completed by July 31, 2026.

Responsible Department(s): County Engineers Office

Project Documents:

Legal Notice – PDF
Bid Results – PDF

Project Status:

Preconstruction